CEMS Backup
Operators of installations falling under the Waste Incineration Directive (WID, 2000/76/EC) must provide alternative monitoring if the CEMS is not available for periods greater than four hours.
Process operators may need the assurance provided by a second CEMS even if not required by regulation. A hot standby system, identical to the running CEMS can be configured to come online in the event of a failure.
A less expensive alternative is to use a transportable system, based upon an FTIR analyser or combination of analysers to provide the full, certified functionality to support several CEMS.
An EA document RM-QG-4 provides the appropriate guidance.
Products
News
Downloads
For more information
To find out more information about our services or products please click here to contact us or call us on +44 (0)1908 227722
